["

Bridging the gap.<\/h1>\n

IMEC recently completed the design & installation supervision\u00a0of a pedestrian bridge in the Shire of Murray, South of Perth.<\/p>\n

<\/p>\n

Working closely with the client, the Shire of Murray & the main contractor Murray Engineering<\/a>,\u00a0<\/strong>IMEC’s structural & civil design team brought their engineering experience to a civic project for the first time.<\/p>\n

\u00a0 \u00a0 \u00a0 \u00a0\"20160613_114707\"<\/p>\n

Engaging local consultants and trades on all facets of the project gave the bridge a real grounding in the local community.<\/p><\/blockquote>\n

 <\/p>\n

\"20160613_092419\"<\/p>\n

Routine inspections during fabrication of steelwork and civil installation formed part of IMEC’s QMS responsibilities.<\/p>\n

The bridges modular design facilitated straightforward transport and gives the added bonus of easy relocation should it be required.<\/p>\n

<\/p>\n

“It was a pleasure working with all stakeholders on this project & the positive community response really drives home the projects success,” Edward Sutoro, \u00a0Lead Structural Engineer.<\/p><\/blockquote>\n

\"DCIM100MEDIADJI_0062.JPG\"<\/p>\n

 <\/p>\n"]