Anagold Copler Gold Mine – Tails Launder Bypass
Projects

Anagold Copler Gold Mine – Tails Launder Bypass

IMEC were engaged to design and shop detail a new tailings thickener bypass systems part of the sites tailings system upgrade.

Engineering works included:

  • Structural modelling and analysis of launder support structure and footings to European standards.
  • Tie in spooling design and valve specification.
  • Engineering design & shop drawings

3D BIM model and structural analysis diagram of the tails launder support steelwork at Copler Gold Mine

Global experience in delivering Civil, Structural, Mechanical engineering projects to the mining industry.

Get In Touch