IMEC was engaged to support with design and onsite construction management for a new primary pump station at Silverlake Resources Deflector Gold Mine.

Works included:

  • Hydraulic modelling underground dewatering network
  • Hydraulic equipment specification incl:
    • Pumps
    • Pipes
    • Valving
    • Sump sizing
  • Engineering and detailed design incl:
    • Concrete plinths & Slab
    • Suction/discharge piping & rising main to surface
    • Monorail Cranes
  • Onsite construction management