Fosterville – Slick Line – Services Concrete
Projects

Fosterville – Slick Line – Services Concrete

IMEC was engaged to design a Surface to Underground paste delivery system. The system included surface paste depository, 1000m delivery line to underground repository.

Engineering works included:

  • Civil design of slabs, plinth, sumps
  • Pipe sizing & valve selection
  • Arrestor kettle & support structure design
  • Access Platforms, Hoppers
  • Risk Assessment, HAZOP

Concrete mixer truck loading at a batching plant beside stacked shipping containers on site

Underground mine service platform with steel pipeline, ventilation duct and yellow access platform

Global experience in delivering Civil, Structural, Mechanical engineering projects to the mining industry.