IMEC was engaged to design a Surface to Underground paste delivery system. The system included surface paste depository, 1000m delivery line to underground repository.

Engineering works included:

  • Civil design of slabs, plinth, sumps
  • Pipe sizing & valve selection
  • Arrestor kettle & support structure design
  • Access Platforms, Hoppers
  • Risk Assessment, HAZOP