IMEC was engaged by Liontown to support with the development of the overall non-process infrastructure for the mine.

  • Design and Optimisation of overall Facility Layouts
  • Sizing and Concept design of Workshops, Fuel Bays, Wash Bays, Administration Blocks and Change houses
  • Preliminary sizing, sizing and routing of all mechanical services infrastructure
  • Development of Scope Documents for all non-process infrastructure